
Installation Instructions
20
Electrical Connection
• Connect the cable harness with the 12 and 8 pole compact connec-
tors to the mating connectors from the built-in cooker or switch box.
Ensure that the cooking surface connector is inserted vertically from
above in accordance with the numeric markings 1 – 2 – 3 – 4 and
that it engages securely. Press the connection cable to the side on the
top of the oven.
1
• Following connection to the mains supply, all cooking zones are to be
switched on, at the maximum setting, one after the other for approx.
30 seconds to check that they function correctly.
Comentarios a estos manuales