
EN - INSTALLATION
15
INSTALLATION
Drilling the Ceiling/shelf and fixing the frame
•Useaplumblinetomarkthecentreofthehobontheceiling/supportshelf.
•Placethedrillingtemplate21 provided on the ceiling/support shelf, making sure that the tem-
plate is in the correct position by lining up the axes of the template with those of the hob.
•Markthecentresoftheholesinthetemplate.
•Drilltheholesatthepointsmarked:
•Forconcreteceilings,drillforplugsappropriatetothescrewsize.
•Forhollowbrickceilingswithwallthicknessof20mm:drillø10mm(immediatelyinsertthe
Dowels 11 supplied).
•Forwoodenbeamceilings,drillaccordingtothewoodscrewsused.
•Forwoodenshelf,drillø7mm.
•Forthepowersupplycablefeed,drillø10mm.
•Fortheairoutlet(DuctedVersion),drillaccordingtothediameteroftheexternalairexhaust
duct connection.
•Inserttwoscrewsofthefollowingtype,crossingthemandleaving4-5mmfromtheceiling:
•Forconcreteceilings,usetheappropriateplugsforthescrewsize(notprovided).
•forCavityceilingwithinnerspace,withwallthicknessofapprox.20mm,Screws12h, sup-
plied.
•Forwoodenbeamceilings,use4woodscrews(notprovided).
•Forwoodenshelf,use4screws12g with washers 22 and nuts 23, provided.
Comentarios a estos manuales